Trail | Length | Season | Permitted Activities (Legend) | Status |
---|---|---|---|---|
1982 Canadian Mount Everest Expedition Interpretive
June 19th: Snow free. Downed trees have been cleared. |
2.1 km | Summer Only |
![]() |
Open |
Bill Benson
June 18th: Snow free. |
0.7 km one-way | Summer Only |
![]() ![]() |
Open |
Black Prince Cirque Interpretive
Note: The Blackshale Creek Suspension Bridge is NOT accessed from this trail.
|
4.2 km | Summer Only |
![]() |
Open |
![]() |
2.2 km one-way | Winter Only |
![]() ![]() |
Warning |
Braille | 2.2 km | Winter Only |
![]() |
Open |
Burstall Pass
June 27th: The lower portion of trail is snow free with snow patches becoming progressively deeper with elevation, with the some completely snow bound sections near border. Creek levels will be very high. Note: Bikes permitted on first 2.9 km of trail ONLY. |
7.4 km one-way | Summer Only |
![]() ![]() |
Open |
Burstall Pass (Backcountry) | km | Winter Only |
![]() |
Open |
Chester Lake
Chester Lake: Annual closure in place for Chester Lake until Jun 29 to allow area to dry and prevent damage to trail. June 19th: Snow free and downed trees removed. Lake is ice free. Sign changeover complete |
4.6 km one-way | Summer Only |
![]() ![]() ![]() |
Closed |
Elbow Lake
June 27th: Significant amount of water on the trails around the lake. |
1.4 km one-way | Summer Only |
![]() ![]() ![]() |
Open |
Elk Pass
June 27th: Snow free. Some sections are muddy. |
5.6 km | Summer Only |
![]() ![]() |
Open |
Highwood Meadows
Closed for construction |
0.6 km one-way | Summer Only |
![]() ![]() |
Closed |
Kananaskis Canyon Interpretive
Closed: Stream crossings washed away by penstock/dam construction. Trail is impassable and is closed indefinitely. |
0.8 km | Summer Only |
![]() |
Closed |
Lookout
June 24th: Snow covered. Downed trees have been removed. |
1.7 km | Summer Only |
![]() ![]() |
Open |
Lower Lake Interpretive | 0.5 km one-way | Summer Only |
![]() |
Open |
Maude-Lawson
June 26th: Snow patches remain at higher elevations. Downed trees have been removed. Note: This trail has been redirected just west of Forks for access to Turbine Canyon. |
7.5 km | Summer Only |
![]() |
Open |
![]() Trackset from Elkwood to the Visitor Centre on April 9th. The remainder was trackset on April 2nd. |
4.0 km | Winter Only |
![]() |
Open |
Peter Lougheed Paved
|
12.1 km one-way | Summer Only |
![]() ![]() |
Open |
Pocaterra
June 24th: Snow covered along two thirds of the trail. Downed trees have been removed. Note: This is not the undesignated Pocaterra Ridge or Cirque route. |
9.9 km one-way | Summer Only |
![]() ![]() |
Open |
Ptarmigan Cirque Interpretive
June 27th: Expect the trail to be wet and slippery. Parking lot at Highwood Meadows closed for construction. |
4.5 km | Summer Only |
![]() |
Warning |
Rawson Lake | 3.9 km one-way | Summer Only |
![]() |
Open |
Rock Glacier Interpretive | 0.15 km one-way | Summer Only |
![]() |
Open |
Rockwall | 0.5 km | Summer Only |
![]() ![]() |
Open |
Rolly Road Training Grid
Six sets of tracks set.
|
km | Winter Only |
![]() |
Open |
![]() |
0.8 km | Year-Round |
![]() ![]() ![]() |
Open |
![]() June 27th: Mostly snow free. One large patch of snow is present at the top of the headwall. Downed trees have been removed. Note: Bikes only permitted to Invincible Creek, 3.8 km from trailhead |
10.2 km | Summer Only |
![]() ![]() |
Open |
Upper Lake | 15.7 km | Summer Only |
![]() ![]() |
Open |
Whiskey Jack | 3.9 km one-way | Summer Only |
![]() ![]() |
Open |
William Watson Lodge Access | 0.6 km one-way | Year-Round |
![]() ![]() ![]() ![]() |
Open |
Peninsula | 0.4 km | Summer Only |
![]() |
Open |
Tailwater Snowshoe | 1.9 km | Winter Only |
![]() ![]() ![]() |
Open |
Frozen Toad Loop Snowshoe | 8.1 km | Winter Only |
![]() ![]() ![]() |
Open |
Torpor Loop | 6.1 km | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
South Sawmill Loop | 2.8 km | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
William Watson Lodge Connector
May 6th: Mainly snow covered. Sign changeover complete. |
0.7 km | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
Boulton Creek Interpretive | 4.9 km | Summer Only |
![]() |
Warning |
Marl Lake Interpretive
June 24th: Downed trees have been removed. |
1.5 km for loop | Summer Only |
![]() ![]() |
Open |
Lower Lake | 3.5 km one-way | Summer Only |
![]() |
Open |
High Rockies (Winter)
Note: Between Nov. 1 and May 1 the trail is closed through the Buller Slide Path due to Highway Avalanche Control. |
63.0 km Goat Creek to Peninsula Day Use | Winter Only |
![]() ![]() ![]() ![]() ![]() |
Open |
High Rockies (Summer)
Note: Hiker-cyclist camping allowed at select day use areas only from Jun 1 - Sep 20. See details.
|
63.0 km Goat Creek to Peninsula Day Use; 80.0 km Goat Creek to Elk Pass | Summer Only |
![]() ![]() ![]() |
Open |