May 2nd: Trails are drying out, particularly at lower elevations and on south facing slopes. Trails on the north side of the valley will have long dry stretches with areas that are very muddy and wet. Please give these areas time to dry to minimize damage.
It's tick season! Make sure to check you and your pets when you get home. For best protection, use a bug repellent with DEET.
Be Bear Aware - bears are awake and active at this time. Practice wildlife safety. Make sure you're making noise on the trail, paying close attention to your surroundings, and carry bear spray and know how to use it.
Always come prepared for a variety of conditions, that can change suddenly throughout the day.
Be aware of closures and avalanche risks in the area and check advisories before you go.
Closures:
Notes:
Trail Name | Permitted Activities (Legend) | Length | Status | Keywords |
---|---|---|---|---|
Cloudline
A detour exists on the Three Sisters Access for Highline and Cloudline. Some construction vehicles may be present in the area. An ice flow has developed over one of the bridges on the east descent / ascent of Cloudline. Caution is required moving over this part of the trail. |
![]() ![]() ![]() |
5.0 km | Warning | |
Clubhouse Cuttoff |
![]() ![]() |
0.8 km | Open | |
Cougar Creek |
![]() |
4.0 km | Open | |
Douglas Fir Bench
Closed: Dec 1 - Jun 15 for wildlife protection. |
![]() ![]() |
1.6 km one-way | Closed | |
Goat Creek |
![]() ![]() |
19.3 km one-way | Open | |
Grassi Lakes Interpretive
|
![]() |
1.9 km | Open | |
Grassi Lakes Upper
|
![]() ![]() |
1.9 km | Open | |
Grotto Mountain |
![]() |
2.7 km | Open | |
Ha Ling |
![]() |
3.5 km to the saddle; 3.9 km to the summit | Open | |
Harvie Heights Ridge Traverse
Construction Closure: Until further notice. For construction of the Bow Valley Community Fire Guard. |
![]() ![]() |
1.0 km | Warning | |
Highline
A detour exists on the Three Sisters Access for Highline and Cloudline. Some construction vehicles may be present in the area. |
![]() ![]() |
8.0 km | Warning | |
Horseshoe Loop |
![]() ![]() ![]() |
4.8 km | Open | |
Johnny's
Construction Closure: Until further notice. For construction of the Bow Valley Community Fire Guard. |
![]() ![]() ![]() |
1.5 km | Warning | |
Lady Macdonald |
![]() |
3.2 km | Open | |
Meander
Construction Closure: Until further notice. For construction of the Bow Valley Community Fire Guard. |
![]() ![]() |
2.0 km | Warning | |
Middle Sister Access |
![]() ![]() ![]() |
1.9km | Open | |
Montane Cutoff
Construction Closure: Until further notice. For construction of the Bow Valley Community Fire Guard. |
![]() ![]() |
1.6 km | Warning | |
Montane Traverse
Construction Closure: Until further notice. For construction of the Bow Valley Community Fire Guard. |
![]() ![]() |
7.7 km | Warning | |
Reclaimer
Preferred use of this trail is downhill mountain biking. Any uphill traffic need to be aware that cyclists may be travelling down this trail at high speeds. |
![]() ![]() |
1.6 km | Warning | |
Riders of Rohan
Preferred use of this trail is downhill mountain biking. Any uphill traffic need to be aware that cyclists may be travelling down this trail at high speeds. |
![]() ![]() |
1.6 km | Warning | |
Rocky Mountain Legacy
Construction Closure (partial): Until further notice. For construction of the Bow Valley Community Fire Guard.
|
![]() ![]() |
20 km | Partially Closed | |
Tibitts Quarry
Construction Closure: Until further notice. For construction of the Bow Valley Community Fire Guard. |
![]() ![]() |
2.1 km | Warning |